ARCONS

HOME  •  M D's MESSAGE  •  CONTACT US  •  CAREER

Factory 100 Military Abou Zaabal

Owner: Factory 100 Military - Abou Zaabal.
Main Contractor: D.S.D – Arab Contractors.
Quantity: 900 Tons
Execution Period: 12 months - 2003

ARCONS Scope of work:
> Mechanical installation of shear line and rolling table with piping and instrumentation.

> Mechanical installation for the heat treatment plant, with piping.

> Mechanical installation of six annealing unit, with piping.

> Mechanical installation of furnace casing, traversing mechanism, charging and discharging system, burners with piping + waste gas duct, recuperator and smock stack.