ARCONS

HOME  •  M D's MESSAGE  •  CONTACT US  •  CAREER

Saint Gobain Glass Factory Ain Sokhna, Egypt

Owner: Saint Gobain
Main Contractor: Hassan Allam Sons (HAS)
Quantity: 3000 Tons.
Execution Period: 6 months 2009-2010.

ARCONS Scope of work Installation steel structure and cladding for different buildings as follows: ���� Furnace building ���� Float bath building ���� Annealing lehr building ���� Warehouse building ���� Patch plant building