
Alex. Luble-oil Plant AMOC
Owner: AMOC
Main Contractor: Foster Wheeler France
Quantity: 850 Ton Steel, 2400 M Piping, 120 Ton
Stairs, 400 M Grating.
Execution Period: 12 Months - 2000:2001
ARCONS Scope of work Erection 40 tank with different diameter from 6-24m with piping, pumps, sandblasting and panting.






