MISR-CANADA Luble-oil Plant 10th RAMADAN

Owner: Misr Canada Oils
Main Contractor: M.C.L
Quantity: 700 Ton Steel, 2000 M Piping, 100 Ton Stairs, 300 M Grating.
Execution Period: Seven months - 1999.

ARCONS Scope of work Erection 27 tank with different diameter with piping, pumps, sandblasting and panting.